Papers › The value of fusion energy to a decarbonized United States electric grid

The value of fusion energy to a decarbonized United States electric grid

19 Sep 2022arXiv:2209.09373links table onlyarchive 2025-07-28

J. A. Schwartz, W. Ricks, E. Kolemen, J. D. Jenkins

The archive published only this paper's code-link row. Authors, date and abstract are from arXiv's metadata (CC0), read from the Kaggle arXiv metadata snapshot of 2026-09-12 where its title matched the archive's; the title is the archive's.

Fusion could be a part of future decarbonized electricity systems, but it will need to compete with other technologies. In particular, pulsed tokamak plants have a unique operational mode, and evaluating which characteristics make them economically competitive can help select between design pathways. Using a capacity expansion and operations model, we determined cost thresholds for pulsed tokamaks to reach a range of penetration levels in a future decarbonized US Eastern Interconnection. The required capital cost to reach a fusion capacity of 100 GW varied from \$3000/kW to \$7200/kW, and the equilibrium penetration increases rapidly with decreasing cost. The value per unit power capacity depends on the variable operational cost and on the cost of its competition, particularly fission, much more than on the pulse cycle parameters. These findings can therefore provide initial cost targets for fusion more generally in the United States.

PaperPDFCode

Code

genxproject/genx officialmentioned in paper report

Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.

Code Syntology ran Syntology

Not run by Syntology. Nothing on this page verifies that the listed code works.

Results from the paper archive 2025-07-28

No leaderboard rows for this paper in the archive.

Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections