Papers › Solving the Resource Constrained Project Scheduling Problem Using the Parallel Tabu...
Solving the Resource Constrained Project Scheduling Problem Using the Parallel Tabu Search Designed for the CUDA Platform
Libor Bukata, Premysl Sucha, Zdenek Hanzalek
In the paper, a parallel Tabu Search algorithm for the Resource Constrained Project Scheduling Problem is proposed. To deal with this NP-hard combinatorial problem many optimizations have been performed. For example, a resource evaluation algorithm is selected by a heuristic and an effective Tabu List was designed. In addition to that, a capacity-indexed resource evaluation algorithm was proposed and the GPU (Graphics Processing Unit) version uses a homogeneous model to reduce the required communication bandwidth. According to the experiments, the GPU version outperforms the optimized parallel CPU version with respect to the computational time and the quality of solutions. In comparison with other existing heuristics, the proposed solution often gives better quality solutions.
Syntology This paper's arXiv id is not in Syntology's Atlas id list (549,449 ids, as this build read them; the read time is in the build record), so this page links to no Syntology page for it. The list is not the whole graph; Syntology's feed shows papers as they enter the graph.
Code
Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.
Code Syntology ran Syntology
Not run by Syntology. Nothing on this page verifies that the listed code works.
Tasks
2 archive task tags without a task page not shown.
Results from the paper archive 2025-07-28
No leaderboard rows for this paper in the archive.
Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections