Papers › Investigating the Recoverable Robust Single Machine Scheduling Problem Under Interval...

Investigating the Recoverable Robust Single Machine Scheduling Problem Under Interval Uncertainty

20 Jul 2021arXiv:2107.09310links table onlyarchive 2025-07-28

Matthew Bold, Marc Goerigk

The archive published only this paper's code-link row. Authors, date and abstract are from arXiv's metadata (CC0), read from the Kaggle arXiv metadata snapshot of 2026-09-12 where its title matched the archive's; the title is the archive's.

We investigate the recoverable robust single machine scheduling problem under interval uncertainty. In this setting, jobs have first-stage processing times p and second-stage processing times q and we aim to find a first-stage and second-stage schedule with a minimum combined sum of completion times, such that at least Delta jobs share the same position in both schedules. We provide positive complexity results for some important special cases of this problem, as well as derive a 2-approximation algorithm to the full problem. Computational experiments examine the performance of an exact mixed-integer programming formulation and the approximation algorithm, and demonstrate the strength of a proposed polynomial time greedy heuristic.

PaperPDFCode

Code

boldm1/recoverable-robust-interval-SMSP officialmentioned in paper report

Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.

Code Syntology ran Syntology

Not run by Syntology. Nothing on this page verifies that the listed code works.

Results from the paper archive 2025-07-28

No leaderboard rows for this paper in the archive.

Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections