Papers › RAP: Risk-Aware Prediction for Robust Planning

RAP: Risk-Aware Prediction for Robust Planning

4 Oct 2022arXiv:2210.01368archive 2025-07-28

Haruki Nishimura, Jean Mercat, Blake Wulfe, Rowan Mcallister, Adrien Gaidon

Robust planning in interactive scenarios requires predicting the uncertain future to make risk-aware decisions. Unfortunately, due to long-tail safety-critical events, the risk is often under-estimated by finite-sampling approximations of probabilistic motion forecasts. This can lead to overconfident and unsafe robot behavior, even with robust planners. Instead of assuming full prediction coverage that robust planners require, we propose to make prediction itself risk-aware. We introduce a new prediction objective to learn a risk-biased distribution over trajectories, so that risk evaluation simplifies to an expected cost estimation under this biased distribution. This reduces the sample complexity of the risk estimation during online planning, which is needed for safe real-time performance. Evaluation results in a didactic simulation environment and on a real-world dataset demonstrate the effectiveness of our approach. The code and a demo are available.

PaperPDFCode

Code

TRI-ML/RAP officialmentioned in papermentioned on GitHubpytorch report

Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.

Code Syntology ran Syntology

Not run by Syntology. Nothing on this page verifies that the listed code works.

Tasks

Prediction

Results from the paper archive 2025-07-28

No leaderboard rows for this paper in the archive.

Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections