Papers › Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with...
Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags
Kim van den Houten, Léon Planken, Esteban Freydell, David M. J. Tax, Mathijs de Weerdt
This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max)). Recent advances in Constraint Programming (CP) and Temporal Networks have reinvoked interest in evaluating the advantages and drawbacks of various proactive and reactive scheduling methods. First, we present a new, CP-based fully proactive method. Second, we show how a reactive approach can be constructed using an online rescheduling procedure. A third contribution is based on partial order schedules and uses Simple Temporal Networks with Uncertainty (STNUs). Our statistical analysis shows that the STNU-based algorithm performs best in terms of solution quality, while also showing good relative offline and online computation time.
In Syntology Open this paper in Syntology's Atlas, the map of the papers in Syntology's graph and their citations.
Code
Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.
Code Syntology ran Syntology
Not run by Syntology. Nothing on this page verifies that the listed code works.
Tasks
Results from the paper archive 2025-07-28
No leaderboard rows for this paper in the archive.
Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections