Papers › North Sea Energy Islands: Impact on National Markets and Grids

North Sea Energy Islands: Impact on National Markets and Grids

31 Mar 2021arXiv:2103.17056links table onlyarchive 2025-07-28

Andrea Tosatto, Xavier Martínez Beseler, Jacob Østergaard, Pierre Pinson, Spyros Chatzivasileiadis

The archive published only this paper's code-link row. Authors, date and abstract are from arXiv's metadata (CC0), read from the Kaggle arXiv metadata snapshot of 2026-09-12 where its title matched the archive's; the title is the archive's.

Taking concrete steps towards a carbon-free society, the Danish Parliament has recently made an agreement on the establishment of the world's first two offshore energy hubs, one on the island of Bornholm and one on an artificial island in the North Sea. Being the two first-of-their-kind projects, several aspects related to the inclusion of these "energy islands" in the current market setup are still under discussion. To this end, this paper presents the first large-scale impact analysis of offshore hubs on the whole European power system and electricity market. The detailed models used for such analysis are publicly released with the paper. Our study shows that energy hubs in the North Sea have a positive impact, and overall increase economic welfare in EU. However, when considering the impact on each country, benefits are not shared equally. In order to help the development of such projects, we focus on the identification of market challenges and system needs arising from the hubs. From a market perspective, we show how exporting countries are negatively affected by the lower electricity prices and we point at potential strategic behaviors induced by the large amount of new transmission capacity installed in the North Sea. From a system point of view, we show how the large amount of wind energy stresses conventional generators, which are required to become more flexible, and national grids, which cannot always accommodate large imports from the hubs.

PaperPDFCode

Code

Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.

Code Syntology ran Syntology

Not run by Syntology. Nothing on this page verifies that the listed code works.

Results from the paper archive 2025-07-28

No leaderboard rows for this paper in the archive.

Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections