Papers › Linear Precoding with Low-Resolution DACs for Massive MU-MIMO-OFDM Downlink
Linear Precoding with Low-Resolution DACs for Massive MU-MIMO-OFDM Downlink
Sven Jacobsson, Giuseppe Durisi, Mikael Coldrey, Christoph Studer
The archive published only this paper's code-link row. Authors, date and abstract are from arXiv's metadata (CC0), read from the Kaggle arXiv metadata snapshot of 2026-09-12 where its title matched the archive's; the title is the archive's.
We consider the downlink of a massive multiuser (MU) multiple-input multiple-output (MIMO) system in which the base station (BS) is equipped with low-resolution digital-to-analog converters (DACs). In contrast to most existing results, we assume that the system operates over a frequency-selective wideband channel and uses orthogonal frequency division multiplexing (OFDM) to simplify equalization at the user equipments (UEs). Furthermore, we consider the practically relevant case of oversampling DACs. We theoretically analyze the uncoded bit error rate (BER) performance with linear precoders (e.g., zero forcing) and quadrature phase-shift keying using Bussgang's theorem. We also develop a lower bound on the information-theoretic sum-rate throughput achievable with Gaussian inputs, which can be evaluated in closed form for the case of 1-bit DACs. For the case of multi-bit DACs, we derive approximate, yet accurate, expressions for the distortion caused by low-precision DACs, which can be used to establish lower bounds on the corresponding sum-rate throughput. Our results demonstrate that, for a massive MU-MIMO-OFDM system with a 128-antenna BS serving 16 UEs, only 3--4 DAC bits are required to achieve an uncoded BER of 10^-4 with a negligible performance loss compared to the infinite-resolution case at the cost of additional out-of-band emissions. Furthermore, our results highlight the importance of taking into account the inherent spatial and temporal correlations caused by low-precision DACs.
Code
Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.
Code Syntology ran Syntology
Not run by Syntology. Nothing on this page verifies that the listed code works.
Results from the paper archive 2025-07-28
No leaderboard rows for this paper in the archive.
Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections