Papers › Evolutionary scheduling of university activities based on consumption forecasts to...

Evolutionary scheduling of university activities based on consumption forecasts to minimise electricity costs

25 Feb 2022arXiv:2202.12595archive 2025-07-28

Julian Ruddick, Evgenii Genov, Luis Ramirez Camargo, Thierry Coosemans, Maarten Messagie

This paper presents a solution to a predict then optimise problem which goal is to reduce the electricity cost of a university campus. The proposed methodology combines a multi-dimensional time series forecast and a novel approach to large-scale optimization. Gradient-boosting method is applied to forecast both generation and consumption time-series of the Monash university campus for the month of November 2020. For the consumption forecasts we employ log transformation to model trend and stabilize variance. Additional seasonality and trend features are added to the model inputs when applicable. The forecasts obtained are used as the base load for the schedule optimisation of university activities and battery usage. The goal of the optimisation is to minimize the electricity cost consisting of the price of electricity and the peak electricity tariff both altered by the load from class activities and battery use as well as the penalty of not scheduling some optional activities. The schedule of the class activities is obtained through evolutionary optimisation using the covariance matrix adaptation evolution strategy and the genetic algorithm. This schedule is then improved through local search by testing possible times for each activity one-by-one. The battery schedule is formulated as a mixed-integer programming problem and solved by the Gurobi solver. This method obtains the second lowest cost when evaluated against 6 other methods presented at an IEEE competition that all used mixed-integer programming and the Gurobi solver to schedule both the activities and the battery use. The code and data used for the paper are publicly available.

PaperPDFCode

Code

EVERGi/predict-then-schedule-university-activities officialmentioned in papermentioned on GitHub report

Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.

Code Syntology ran Syntology

Not run by Syntology. Nothing on this page verifies that the listed code works.

Tasks

SchedulingTime SeriesTime Series Analysis

Results from the paper archive 2025-07-28

No leaderboard rows for this paper in the archive.

Methods

BASE

Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections