Papers › Bug Priority Change: An Empirical Study on Apache Projects
Bug Priority Change: An Empirical Study on Apache Projects
Zengyang Li, Guangzong Cai, Qinyi Yu, Peng Liang, Ran Mo, Hui Liu
The archive published only this paper's code-link row. Authors, date and abstract are from arXiv's metadata (CC0), read from the Kaggle arXiv metadata snapshot of 2026-09-12 where its title matched the archive's; the title is the archive's.
In issue tracking systems, each bug is assigned a priority level (e.g., Blocker, Critical, Major, Minor, or Trivial in JIRA from highest to lowest), which indicates the urgency level of the bug. In this sense, understanding bug priority changes helps to arrange the work schedule of participants reasonably, and facilitates a better analysis and resolution of bugs. According to the data extracted from JIRA deployed by Apache, a proportion of bugs in each project underwent priority changes after such bugs were reported, which brings uncertainty to the bug fixing process. However, there is a lack of indepth investigation on the phenomenon of bug priority changes, which may negatively impact the bug fixing process. Thus, we conducted a quantitative empirical study on bugs with priority changes through analyzing 32 non-trivial Apache open source software projects. The results show that: (1) 8.3% of the bugs in the selected projects underwent priority changes; (2) the median priority change time interval is merely a few days for most (28 out of 32) projects, and half (50. 7%) of bug priority changes occurred before bugs were handled; (3) for all selected projects, 87.9% of the bugs with priority changes underwent only one priority change, most priority changes tend to shift the priority to its adjacent priority, and a higher priority has a greater probability to undergo priority change; (4) bugs that require bug-fixing changes of higher complexity or that have more comments are likely to undergo priority changes; and (5) priorities of bugs reported or allocated by a few specific participants are more likely to be modified, and maximally only one participant in each project tends to modify priorities.
Code
Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.
Code Syntology ran Syntology
Not run by Syntology. Nothing on this page verifies that the listed code works.
Results from the paper archive 2025-07-28
No leaderboard rows for this paper in the archive.
Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections