Papers › Assessing the Risk of Proliferation via Fissile Material Breeding in ARC-class Fusion...

Assessing the Risk of Proliferation via Fissile Material Breeding in ARC-class Fusion Power Plants

18 Apr 2024arXiv:2404.12451links table onlyarchive 2025-07-28

J. L. Ball, E. E. Peterson, R. S. Kemp, S. E. Ferry

The archive published only this paper's code-link row. Authors, date and abstract are from arXiv's metadata (CC0), read from the Kaggle arXiv metadata snapshot of 2026-09-12 where its title matched the archive's; the title is the archive's.

Construction of a nuclear weapon requires access to kilogram-scale quantities of fissile material, which can be bred from fertile material like U-238 and Th-232 via neutron capture. Future fusion power plants, with total neutron source rates in excess of 10²⁰ n/s, could breed weapons-relevant quantities of fissile material on short timescales, posing a breakout proliferation risk. The ARC-class fusion reactor design is characterized by demountable high temperature superconducting magnets, a FLiBe liquid immersion blanket, and a relatively small size (∼ 4 m major radius, ∼ 1 m minor radius). We use the open-source Monte Carlo neutronics code OpenMC to perform self-consistent time-dependent simulations of a representative ARC-class blanket to assess the feasibility of a fissile breeding breakout scenario. We find that a significant quantity of fissile material can be bred in less than six months of full power operation for initial fertile inventories ranging from 5 to 50 metric tons, representing a non-negligible proliferation risk. We further study the feasibility of this scenario by examining other consequences of fissile breeding such as reduced tritium breeding ratio, extra heat from fission and decay heat, isotopic purity of bred material, and self-protection time of irradiated blanket material. We also examine the impact of Li-6 enrichment on fissile breeding and find that it substantially reduces breeding rate, motivating its use as a proliferation resistance tool.

PaperPDFCode

Code

jlball/arc-nonproliferation officialmentioned on GitHub report

Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.

Code Syntology ran Syntology

Not run by Syntology. Nothing on this page verifies that the listed code works.

Results from the paper archive 2025-07-28

No leaderboard rows for this paper in the archive.

Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections