Papers › ANN-Based Grid Impedance Estimation for Adaptive Gain Scheduling in VSG Under Dynamic...

ANN-Based Grid Impedance Estimation for Adaptive Gain Scheduling in VSG Under Dynamic Grid Conditions

29 Jun 2025arXiv:2506.23304archive 2025-07-28

Quang-Manh Hoang, Van Nam Nguyen, Taehyung Kim, Guilherme Vieira Hollweg, Wencong Su, Van-Hai Bui

In contrast to grid-following inverters, Virtual Synchronous Generators (VSGs) perform well under weak grid conditions but may become unstable when the grid is strong. Grid strength depends on grid impedance, which unfortunately varies over time. In this paper, we propose a novel adaptive gain-scheduling control scheme for VSGs. First, an Artificial Neural Network (ANN) estimates the fundamental-frequency grid impedance; then these estimates are fed into an adaptive gain-scheduling function to recalculate controller parameters under varying grid conditions. The proposed method is validated in Simulink and compared with a conventional VSG employing fixed controller gains. The results demonstrate that settling times and overshoot percentages remain consistent across different grid conditions. Additionally, previously unseen grid impedance values are estimated with high accuracy and minimal time delay, making the approach well suited for real-time gain-scheduling control.

PaperPDFCode

Code

Repository list and official/mentioned flags are the archive's, frozen 2025-07-28. Reachability, where shown, is from one Syntology probe window (2026-09-16 to 2026-09-18); repositories not probed show nothing. GitHub stars are not tracked.

Code Syntology ran Syntology

Not run by Syntology. Nothing on this page verifies that the listed code works.

Tasks

Scheduling

Results from the paper archive 2025-07-28

No leaderboard rows for this paper in the archive.

Report a problem or propose a change · a person checks every report against the paper or source before anything changes; decisions are listed on /corrections